He included that Period two would cover the stretch within the Lekki next toll gate into the Ajah beneath-bridge and could well be divided into 4 sections. “Motorists from Ajah inward Lekki might be diverted to one lane while repairs are ongoing on the other lane,” Osiyemi mentioned. “When the https://lennyx108wdj3.wikiinside.com/user